The Challenge
For a newly built apartment complex in Rotterdam, the client’s own hoist had to be installed. Due to the specific façade elements of the building, a standard anchoring solution was not suitable.
The Solution
For this project, De Jong Liften designed and applied a special anchoring system, fully adapted to the façade structure. This allowed the hoist to be installed safely and used effectively during the construction process.